Skip to content
URGENT Facility Management Service Ltd
Home Company Services Projects Gallery Partners Contact
Gallery

From our sites

Photos and short videos from our construction, groundworks, and mechanical and electrical work across Abuja and Rivers State.

Showing all 79

  • Finished terrace duplex

  • Two-storey concrete frame with formwork in place

    Olu Awotesu Street, AbujaJul 2026

  • Two cranes positioning a storage tank

  • Raft foundation reinforcement across the full slab

  • Bungalow shell complete, with paved surrounds

    Kuje, AbujaNov 2026

  • Fire pump sets with their control panels

    Igwuruta, Rivers StateOct 2025

  • Timber formwork for a lintel beam on blockwork

  • Pipework installation on scaffolding inside an industrial plant

  • Pipe laid in a trench, ready for backfilling

  • Interior door fitted during finishing works

  • Site meeting on a plant platform

  • Bungalow plastered, with external works set out

    Kuje, AbujaOct 2026

  • Cable pulling on a raised steel platform

  • Block-lined drainage channel under construction

    Kuje, AbujaSep 2026

  • Concrete paving across the compound

    Kuje, AbujaNov 2026

  • Reviewing drawings on an excavated site

  • Two-storey building with scaffolding up for plastering

  • Excavation around pipework at a metering station

  • Motor grader shaping an access road

    Kuje, AbujaAug 2026

  • Roller compacting the site

    Video

  • Engineers checking plans on site

  • Wall reinforcement with the basement slab beyond

  • Grader levelling the site

    Kuje, AbujaAug 2026

  • Paved yard with the pavilion beyond

    Kuje, AbujaNov 2026

  • Engineers setting out on a cleared site

  • Checking a fire pump installation

  • Borehole drilling rig at work

  • Finished kitchen with island and feature lighting

  • Commissioning team at a water treatment unit

  • Timber roof trusses on a blockwork bungalow

  • Basement wall reinforcement in place

    Video

  • Control panel of a water treatment system

  • Excavator clearing and stripping the site

  • Decorative entrance gate installed

  • Project team in the pump house

  • Foundations complete and filled, ready for the floor slab

    Kuje, AbujaNov 2026

  • Reverse-osmosis membrane housings in a water treatment plant

  • Foundation trenches set out

    Kuje, AbujaNov 2026

  • Site team on a slab

  • Hardcore laid and formwork going in

    Kuje, AbujaNov 2026

  • Estate road graded, with aggregate stockpiled

  • Interior ceiling works in progress

  • Bulldozer clearing the site

    Video

  • Survey team with a levelling instrument

  • Reinforcement and formwork for a concrete base

    Kuje, AbujaNov 2026

  • Storage tank lifted between two cranes

  • Fence posts set out on a cleared plot

  • Engineers on slab reinforcement before the pour

  • Roof trusses with roofing sheets going on

  • Storage tank checked on delivery

  • Foundation blockwork with trenches open

  • Site supervision on a reinforced slab

  • Water treatment equipment delivered to site

  • Columns and beam formwork on the frame

    Olu Awotesu Street, AbujaJul 2026

  • Transformers installed at a residential estate

  • Preparing to concrete the basement walls

    Video

  • Two-storey blockwork shell

  • Sectional water tank with its feed pipe

  • Terrace houses with scaffolding for plastering

  • Checking the base of a steel tower

  • Inspecting a roof slab and parapet blockwork

  • Fire pump room installation

  • Suspended slab formwork and reinforcement

  • Transformer substation installation

  • Casting a ground-floor slab

  • Basement raft reinforcement in the excavation

  • Basement wall formwork and propping

  • Concreting the ground slab over compacted hardcore

  • Hardcore filled and edge formwork set for the floor slab

  • Walkthrough of slab reinforcement with electrical conduits in place

    Video

  • Basement walls cast, with slab formwork going up

  • Inspecting slab reinforcement and conduits

  • Blockwork rising on a three-storey building

  • Reinforcement and formwork for a basement wall

  • Slab reinforcement ready for concrete

  • Pad foundations being excavated and cast

  • Residential block at plastering stage

  • Basement walls and compartments formed

  • Glazed facade nearing completion

Have a site in mind?

Tell us about the land, the brief and the budget, and we’ll get back to you to talk it through.

Start a project Call 0814 293 5081

URGENT Develop, build and manage. Abuja, Nigeria.
Offices Head officeSuite 105, Shashilga Court,
Plot 111 & 112 Sector Central A,
Bannex Gwarinpa Expressway, Jahi, Abuja
Branch officeNo. 33 Olusola Owolana Street, Dawaki Extension II, Abuja
Contact 0814 293 5081 info@urgent.com.ng
© 2026 Urgent Facility Management Service Ltd. RC 1871925. Back to top